Skip to content
Logo
World of Project Management

  • Home
  • Courses
    • PMP
      • Project Management Fundamentals
      • Project Integration Management​
      • Project Scope Management​
      • Project Schedule Management​
      • Project Cost Management​
      • Project Quality Management​
      • Project Resource Management​
      • Project Communications Management​
      • Project Risk Management​
      • Project Procurement Management​
      • Project Stakeholder Management​
    • AGILE
      • Agile Principles and Mindset
      • Scrum
  • Quiz
    • Major Test Series
    • Mini Test Series
  • Videos
  • Forum
  • PM Talks
  • Blog
  • Jobs
  • ADA
  • Search
  • Profile
  • Topics Started
  • Replies Created
  • Engagements
  • Favorites

@erlindabrockman

Profile

Registered: 3 years, 5 months ago

How Insulated Panels Speed Up The Construction

 
Introduction
 
 
Insulated Panels are prefabricated building panels used in floors, partitions, ceilings on buildings. Installing insulated panels for building constructions are aimed to ensure the energy effectivity, simple and fast set up and a lower in working costs. A structural insulated panel (SIP) is a composite building material; consisting of an insulating layer core sandwiched between two layers of metals.
 
 
Options of SIP
 
 
SIP's are commonly made of the Oriental Strand Board (OSB) panels sandwiched around a foam core made of expanded polystyrene (EPS), extruded polystyrene (XPS) or rigid polyurethane foam. Different materials equivalent to plywood, pressure-treated plywood for beneath-grade basis walls, metal, aluminum, cement board corresponding to Hardie Backer, and even exotic supplies like stainless steel, fiber-reinforced plastic, and magnesium oxide will also be used in replacement of OSB. SIPs provide continuous air and vapor barrier as well as increased R-Worth compared to traditional constructions. When labor value, material waste and energy efficiency are considered SIPs are comparable to more typical building methods.
 
 
History
 
 
The Idea of Structural Insulated Panels (SIPs) launched The Forest Products Laboratory in Madison, Wisconsin in 1935. The laboratory developed a prototype panel consisted of framing members, plywood and hard board sheathing, and insulation. These initial panels had been used to build test houses and tested after 30 years to disclose that the panels retain their initial strength. In 1952 Alden B. Dow created the first foam cores SIPs which had been being mass produced within the 1960's.
 
 
Tips on how to use SIP
 
 
The SIPs are designed to resist axial loads, shear loads and out of edge loads. These can be used for floors, walls, roofs etc... for the buildings. They've the ability to withstand the bi-axial bending and lateral shear; so, they're very much suitable for use as roofs and floors. Probably the most widely used panel joint connections are the Surface spline and Block Spline. The Surface spline Joint Connection consists of the strip of OSB or plywood inserted into slots within the foam. The block spline is a thin and slender SIP assembly that is inserted into recesses in the foam along the panel edges. These connections end in a continuous foam core throughout the panels. This helps to eliminate air filtration at the joints.
 
 
One other joint connection is Mechanical cam locks; create a tighter joint between the panels. In any type of connection, the seam along the sheathing must be covered with a steady line of panel tape. Openings might occur at the edges and corners of the panel, and so the panel foam could be recessed to access lumber headers. Any opening within the SIPs that accept one other enclosed aspect should be properly sealed.
 
 
Benefits and Drawbacks
 
 
Benefits:
 
 
1. SIP provides the tighter building envelope and the walls will have higher insulating properties.
 
2. Lower in working costs.
 
3. Buildings made with insulated panels will be simply dismantled and reused
 
4. Insulated panel properties (power and thermal insulation property) will stay the identical if reused.
 
5. It's value efficient as it might be installed easily
 
 
Drawbacks:
 
 
1. Quite poor performance with respect to the noise control.
 
2. Can be damaged by moisture. Better to use the panels with waterproof surfaces.
 
3. Panels needs to be properly protected from pests/insecticides.
 
4. Requires a proper mechanical air flow system
 
5. Modification of the initial project is costly.
 
 
Conclusion
 
 
The Structural Insulated Panels come prefabricated and ready to be assembled, and therefore it helps to speed up the construction.Additionally, it requires minimal equipment and workforce and hence value effective.

Website: https://conquerornz.co.nz/


Forums

Topics Started: 0

Replies Created: 0

Forum Role: Participant

Recent Posts

  • Youtube Channel – World of Project Management
  • Project Management Case Studies
  • PMP 2021 extra study material by PMI
  • PMP Exam – Free Coaching Session
  • Senior Program Manager at Amazon, Luxembourg City – Luxembourg

Recent Comments

  • admin on Free PMP Practice Exam by PMI
  • cakil on Free PMP Practice Exam by PMI
  • admin on PMI-ACP Exam Question Bank
  • Gary on PMI Online Exam Experience
  • Manish Dev Mahanti on PMI Online Exam Experience

Archives

  • December 2021
  • May 2021
  • January 2021
  • September 2020
  • August 2020
  • May 2020
  • March 2020
  • February 2020
  • January 2020
  • September 2019
  • July 2019
  • June 2019
  • May 2019
  • April 2019

Categories

  • Agile/CSM
  • Asia & Africa
  • Australia & NZ
  • Blog
  • Europe
  • India
  • Jobs
  • Miscellaneous
  • North America
  • PMP
  • PMTalks
  • Scrum

Meta

  • Register
  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
Loading
  • Google Play
Copyright © 2025 World of Project Management