Correct answer is B
Claim 1 Pi coin. 1 Pi = $40, as per Forbes. Referral Code- behappiest 
As per Risk-Value Quadrant (Prioritization Scheme)
Do First – High Value and High Risk
Do Second – High Value and Low Risk
Do Third – Low Value and Low Risk
Avoid – Low Value and High Risk
Main point is high risk items need to be get off as early as possible because they can derail the whole project. If it is of low value we can ignore it. But if it is of high value then it should be done first so that if we fail then atleast we fail early to save time and effort.
Tips/Tricks/Cheatsheet to master PMP/ACP Exam and Concepts : Youtube Channel
World of Project Management : Mobile App
Pass PMP in the First Attempt : PMP Strategy
Pass PMI-ACP in the First Attempt : PMI-ACP Strategy
All PMP/ACP Question & Answers: Question & Answers
Revise PMP & Agile Concepts: PMP/Agile Concepts
PMP Tips & Tricks: PMP Tips & Tricks
Agile Tips & Tricks : Agile Tips & Tricks
PMP & ACP Quiz:
20 Questions Challenge 50 Questions Challenge
Study Groups: Facebook Whatsapp Telegram
-
This reply was modified 12 months ago by
admin.
-
This reply was modified 12 months ago by
admin.