Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #28250
    admin
    Keymaster

    What will be the approach to develop the requirement that is of High Value and Low Risk?

    A. Do First
    B. Do Second
    C. Do Later
    D. Do it when you want to engage stakeholders

    #28253
    admin
    Keymaster

    Correct answer is B
    Claim 1 Pi coin. 1 Pi = $40, as per Forbes. Referral Code- behappiest

    As per Risk-Value Quadrant (Prioritization Scheme)
    Do First – High Value and High Risk
    Do Second – High Value and Low Risk
    Do Third – Low Value and Low Risk
    Avoid – Low Value and High Risk

    Main point is high risk items need to be get off as early as possible because they can derail the whole project. If it is of low value we can ignore it. But if it is of high value then it should be done first so that if we fail then atleast we fail early to save time and effort.

    Tips/Tricks/Cheatsheet to master PMP/ACP Exam and Concepts : Youtube Channel

    World of Project Management : Mobile App

    Pass PMP in the First Attempt : PMP Strategy

    Pass PMI-ACP in the First Attempt : PMI-ACP Strategy

    All PMP/ACP Question & AnswersQuestion & Answers

    Revise PMP & Agile ConceptsPMP/Agile Concepts

    PMP Tips & TricksPMP Tips & Tricks

    Agile Tips & Tricks : Agile Tips & Tricks

    PMP & ACP Quiz:
    20 Questions Challenge 50 Questions Challenge

    Study Groups: Facebook Whatsapp Telegram

    • This reply was modified 12 months ago by admin.
    • This reply was modified 12 months ago by admin.
Viewing 2 posts - 1 through 2 (of 2 total)
  • You must be logged in to reply to this topic.